Skip to content

Thermal plant engineered for the Saudi summer

Cooling towers, heat exchangers, HVAC and MEP systems for industrial and commercial sites across the Kingdom. Sized to your site's real wet bulb, fabricated in-house, and maintained by the team that installed them.

Plant down? Breakdown line, 24/7: +966 53 783 7389
Air-cooled condenser bank
In the pictureAir-cooled condenser bankSelected against a design ambient of up to 55 °C, with no water consumption at all.How we select them
Years in the Kingdom
15+
Projects delivered
50+
Cities covered
4
Breakdown response
24/7

Trusted by operators across the Kingdom

  • Savola Foods
  • Halwani Bros
  • Hilton & Waldorf Astoria
  • Zamil Air Conditioners
  • Marafiq
  • Saudi Binladin Group
  • Al Nafie Steel
  • Fakieh Poultry
  • Napco
  • York
  • CompAir
  • Del Monte
  • B-Cola
  • Arrow Juice Factory
  • Al Tawfeeq Company
  • 3P Gulf Group
  • AHG

Selected for the site, not the catalogue

Most thermal plant underperforms on the hottest day of the year because it was sized to a nominal figure. These are the numbers we design to instead.

  • Site wet bulb

    Towers sized to real conditions

    Condensers and towers are selected against the site's design wet bulb, not a regional average. An optimistic figure underperforms exactly when the plant needs it most.

  • 55 °C

    Design ambient for air-cooled plant

    Air-cooled equipment is selected against the real design ambient, up to 55 °C, and the resulting condensing temperature is stated rather than implied.

  • 2.1–3.2 mm

    Fin pitch chosen for dust

    Coil fin spacing follows the site's sand and dust loading. A coil that still works in year three beats a tighter one that blocks in six months.

  • 40%

    Less water than an open circuit

    Closed-circuit towers and evaporative condensers keep the process fluid sealed and cut water use, because on most Saudi sites water is the constraint that matters.

The same five steps on every job

Whether it is a new cooling tower or a boiler opened for re-tubing, nothing is subcontracted to a name you have not met.

  1. Step 1

    Survey

    We measure on site: load, footprint, water chemistry, access, and what the existing plant is actually doing rather than what its nameplate says.

  2. Step 2

    Design and select

    Thermal sizing and equipment selection, costed on what the plant will draw over its life rather than on purchase price alone.

  3. Step 3

    Fabricate

    Shells, tube bundles, coils, ducting and spares built to drawing, so a replacement matches the plant it is going into.

  4. Step 4

    Install and commission

    Rigged, connected, pressure tested and handed over with performance verified against the design figures.

  5. Step 5

    Maintain

    Planned maintenance and breakdown response, with spares held for the plant we already look after.

Built to the code your specification calls for

Every unit is designed and fabricated against the standard your specification names, with the inspection and documentation trail to prove it.

Pressure vessels
ASME VIII
Shell and tube exchangers
TEMA
Unfired pressure vessels
EN 13445
Process heat exchangers
API 660
Cooling tower thermal performance
CTI
HVAC design methodology
ASHRAE
Duct construction
SMACNA
Holiday testing of linings
NACE SP0188

A record you can check

Cooling towers, heat exchangers, boilers and full HVAC and MEP packages delivered across four Saudi cities.

ClientYear
Halwani BrosCooling tower, Jeddah2023
Hilton Hotel & Waldorf Astoria ResortsHeat exchanger, Jeddah2023
Savola FoodsHVAC & MEP, Jeddah2022
Zamil Air ConditionersHeat exchanger, Dammam2022
MarafiqCooling tower, Jeddah2021
Saudi Binladin GroupBoiler, Makkah2021

Tell us the load, the site and the timeline.

Send the duty, the site and anything written on the nameplate. An engineer replies with questions first, then a costed proposal.

Plant down right now? Call the breakdown line on +966 53 783 7389, any hour.