Thermal plant engineered for the Saudi summer
Cooling towers, heat exchangers, HVAC and MEP systems for industrial and commercial sites across the Kingdom. Sized to your site's real wet bulb, fabricated in-house, and maintained by the team that installed them.

- Years in the Kingdom
- 15+
- Projects delivered
- 50+
- Cities covered
- 4
- Breakdown response
- 24/7
Trusted by operators across the Kingdom
- Savola Foods
- Halwani Bros
- Hilton & Waldorf Astoria
- Zamil Air Conditioners
- Marafiq
- Saudi Binladin Group
- Al Nafie Steel
- Fakieh Poultry
- Napco
- York
- CompAir
- Del Monte
- B-Cola
- Arrow Juice Factory
- Al Tawfeeq Company
- 3P Gulf Group
- AHG
Eight service lines, one engineering team
From the first survey to lifetime maintenance, equipment is selected and commissioned to cut running cost, not just to meet the load.
Shell & Tube Heat ExchangersDesign, fabrication and re-tubing
Evaporative Condensers & Cooling TowersSelection, supply, installation and maintenance
Air-Cooled Condensers & Dry CoolersEvaporators, radiators and dry coolers
HVAC & MEPDesign, supply, install and commission
Compressor OverhaulingInspection, rebuild and recommission
Boiler Re-tubing & MaintenanceFire-tube and water-tube boilers
Heating & Cooling MaintenancePlanned maintenance, breakdown response and upgrades
Polyurea CoatingSpray-applied protective linings








Thermal design, in-house fabrication, pressure testing and field re-tubing of shell and tube exchangers for process duty.
Selected for the site, not the catalogue
Most thermal plant underperforms on the hottest day of the year because it was sized to a nominal figure. These are the numbers we design to instead.
Site wet bulb
Towers sized to real conditions
Condensers and towers are selected against the site's design wet bulb, not a regional average. An optimistic figure underperforms exactly when the plant needs it most.
55 °C
Design ambient for air-cooled plant
Air-cooled equipment is selected against the real design ambient, up to 55 °C, and the resulting condensing temperature is stated rather than implied.
2.1–3.2 mm
Fin pitch chosen for dust
Coil fin spacing follows the site's sand and dust loading. A coil that still works in year three beats a tighter one that blocks in six months.
40%
Less water than an open circuit
Closed-circuit towers and evaporative condensers keep the process fluid sealed and cut water use, because on most Saudi sites water is the constraint that matters.
The same five steps on every job
Whether it is a new cooling tower or a boiler opened for re-tubing, nothing is subcontracted to a name you have not met.
Step 1
Survey
We measure on site: load, footprint, water chemistry, access, and what the existing plant is actually doing rather than what its nameplate says.
Step 2
Design and select
Thermal sizing and equipment selection, costed on what the plant will draw over its life rather than on purchase price alone.
Step 3
Fabricate
Shells, tube bundles, coils, ducting and spares built to drawing, so a replacement matches the plant it is going into.
Step 4
Install and commission
Rigged, connected, pressure tested and handed over with performance verified against the design figures.
Step 5
Maintain
Planned maintenance and breakdown response, with spares held for the plant we already look after.
Held in stock or built to your drawing
Cooling towers, heat exchangers, HVAC plant, spares and duct accessories, measured on site and built to match.
- Cooling Towers
- Air-Cooled Equipment
- Heat Exchangers
- HVAC Equipment
- Plant & Machinery
- Tower Internals & Spares
- Duct & Accessories

Cooling Towers
Industrial Crossflow Cooling Tower
Induced draught crossflow, single or multi-cell

Air-Cooled Equipment
Air-Cooled Condenser
5 kW to 10,000 kW+ with zero water consumption

Heat Exchangers
Shell & Tube Heat Exchanger
TEMA and ASME VIII design, fabrication and re-tubing

HVAC Equipment
Air Handling Units (AHU)
Coil, fan and filter sections, standalone or BMS-controlled

Plant & Machinery
Refrigeration & Process Compressors
Reciprocating, screw and centrifugal

Tower Internals & Spares
PVC Fill Media
Film fill packs cut to suit the tower

Duct & Accessories
Round Spiral Duct
Galvanised steel, fabricated to drawing

Cooling Towers
SSS Modular Cooling Tower
Modular towers for light commercial and process duty
Built to the code your specification calls for
Every unit is designed and fabricated against the standard your specification names, with the inspection and documentation trail to prove it.
- Pressure vessels
- ASME VIII
- Shell and tube exchangers
- TEMA
- Unfired pressure vessels
- EN 13445
- Process heat exchangers
- API 660
- Cooling tower thermal performance
- CTI
- HVAC design methodology
- ASHRAE
- Duct construction
- SMACNA
- Holiday testing of linings
- NACE SP0188
A record you can check
Cooling towers, heat exchangers, boilers and full HVAC and MEP packages delivered across four Saudi cities.
| Client | Sector | Scope | City | Year |
|---|---|---|---|---|
| Halwani BrosCooling tower, Jeddah | Food processing | Cooling tower | Jeddah | 2023 |
| Hilton Hotel & Waldorf Astoria ResortsHeat exchanger, Jeddah | Hospitality | Heat exchanger | Jeddah | 2023 |
| Savola FoodsHVAC & MEP, Jeddah | Food processing | HVAC & MEP | Jeddah | 2022 |
| Zamil Air ConditionersHeat exchanger, Dammam | HVAC manufacturing | Heat exchanger | Dammam | 2022 |
| MarafiqCooling tower, Jeddah | Power & utilities | Cooling tower | Jeddah | 2021 |
| Saudi Binladin GroupBoiler, Makkah | Construction | Boiler | Makkah | 2021 |
Tell us the load, the site and the timeline.
Send the duty, the site and anything written on the nameplate. An engineer replies with questions first, then a costed proposal.
Plant down right now? Call the breakdown line on +966 53 783 7389, any hour.